Door closure installation board
Caregory:
Key:
Door closure installation board
+86-0411-87570868
Inquiry
Product Introduction
Assembly of components for plate heat exchangers, whether the manufacturer ships the parts to the user unit, assembles them on site, or assembles the plate heat exchangers after the equipment is overhauled, must be carried out in the following order. Check whether all parts are complete according to the drawings, and whether the models and sizes are consistent with the drawings.
Assembled according to the designed flowchart and clamped in the prescribed order. Pay attention to tighten the nuts in order when clamping. Then pry off the seal of the I/O connector on the chassis. Tip: You can remove the bezel at the corresponding position behind the chassis according to the motherboard interface.
The baffles of the unmanned vending machine shipping gearbox are directly connected to the chassis, and it needs to be jacked open with a screwdriver first, and then wrenched down with sharp-nosed pliers. Bezels with card placement can be determined as needed, rather than removing all bezels. This is the commonly available ATX power connector on ATX motherboards, and you only need to insert the same appearance plug on the power supply into this interface to complete the connection to the ATX power supply. The picture above is a unique power connector in the P4 motherboard and power supply, which you can plug in one by one.
Related Products
Inquiry
Scan right QR code
Pay attention to us
Real time attention to service dynamics

Contact
Contact person: Mr. Sheng
Mobile phone: 15542566888
Tel: +86-0411-87570868
Fax: +86-0411-87570878
E-mail: songyujinshu@163.com
Postal code: 116620
Address: 1F 5-3 Dadi Street,Pilot Free Trade Zone,Development Zone,Dalian,Liaoning.China.
Copyright © 2023 Dalian Casiman Metal Products Co., Ltd. SEO Business License Powered by www.300.cn
右侧在线客服组件